Megger Report docs

Searching:
Download
Megger Report - Fast Download

Download Megger Report from our fatest mirror

Test Reports Template - United States Department of Health ...

6102 dl's @ 4570 KB/s

doc
Test Reports Template - United States Department of Health ...

This <Project Name> Test Report provides a summary of the results of test performed as outlined within this document. 2.0 Test Summary

http://www.hhs.gov/ocio/eplc/EPLC%20Archive%20Documents/46-Test%20Reports/eplc_test_reports_template.doc

Date added: September 1, 2011 - Views: 953

doc
26 05 19 - Loomis

NECA (National Electrical Contractors Association) ... Provide written report of megger test results. Test report to include all test conditions.

http://loomis.ca.gov/filesystem/Blue_Anchor_Park_Specs/260519___Low_Voltage.doc

Date added: November 15, 2012 - Views: 15

doc
piyushpanchal2007.mynetworksolutions.com

-Cable megger report (primary prior to pulling)-Cable megger report (secondary after pulling)-Pressure test record(TR) ... SUDI ARAMCO ENGINEERING PROCEDURE. {SAEP}

http://piyushpanchal2007.mynetworksolutions.com/images/Inst._Insp._and_Qua._Con..doc

Date added: November 1, 2011 - Views: 35

doc
www.tequipment.net

Megger’s MIT420 Insulation Resistance and Continuity Tester has been the instrument of choice of Lou Iaconelli. ... Transfer this data to the customer report.

http://www.tequipment.net/assets/1/26/Documents/Megger/MIT430_EN/mit430_en_doc_5.doc

Date added: January 4, 2014 - Views: 2

doc
CM FILE DOCUMENTS CHECK LIST (FISHING VESSELS)

MSF 1328 Hull Survey Report MSF 1335 Condition of Stern Gear Evidence of Machinery Maintenance Ultrasonics Report Megger Test Report Air Receiver Safety Valve Test ...

https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/292264/chapter_1_annex_12_part_b_as_at_23_10_2012.doc

Date added: September 4, 2014 - Views: 1

doc
Megger Testing of Busses, MCCs, and Distribution Panels ...

Subject: Megger Testing of Busses, MCCs, and Distribution Panels. Revision Number and Date: ... Contact your supervisor and report any equipment deficiencies.

http://gwenholladay.weebly.com/uploads/5/0/6/9/5069966/lum-ffa-mnt-0016__megger_testing_of_busses_mccs_and_distribution_panels__draft.docx

Date added: May 2, 2013 - Views: 32

doc
faaco.faa.gov

Use a portable ground testing megger in accordance with manufacturer's instructions to test each ground or group of grounds.

http://faaco.faa.gov/attachments/16302N.doc

Date added: October 3, 2011 - Views: 50

doc
26 13 90 (16499) - Medium Voltage Power System Maintenance

.2 Megger test using 250V megger between core and ground to ensure no other grounds exist between ... Record data on test report form..2 Megger test insulators to ...

http://www.infrastructure.alberta.ca/Content/docType486/Production/26_13_90_PMS.doc

Date added: October 21, 2011 - Views: 39

doc
SECTION 16117 - FRDF TESTS - FAACO - Federal Aviation ...

These tests shall be completed using a 500V megger. ... The results shall be submitted to the COTR in a “separate” report for operational test.

http://faaco.faa.gov/attachments/0700346_specs_9.doc

Date added: October 9, 2012 - Views: 53

doc
www.davispickering.com

Near Miss Report. First Report OH. First Report WV. OSHA 300 Log . OSHA 300A Form. ... 532a Feeder Cable Megger Report 1 532b Equipment Megger Report 0.

http://www.davispickering.com/training/Quality/0%20CQ%20Program%20Index%20Rev%200d.doc

Date added: June 1, 2014 - Views: 12

doc
Megger Testing of Transformers Effective TBD

LUM-FFA-MNT-0020 Megger Testing of Transformers R0Page 19 of 20. Page 20 of ... Report discrepancies or unsatisfactory results to the Work Group Supervisor for follow ...

http://gwenholladay.weebly.com/uploads/5/0/6/9/5069966/lum-ffa-mnt-0020__megger_testing_of_transformers__draft.docx

Date added: July 12, 2013 - Views: 52

doc
MSFC Problem Reporting and Corrective Action (PRACA) System

MSFC Problem Reporting and Corrective ... Contractor Report Number E-009 JSC# -- KSC# -- Problem Title CONNECTOR PINS FAILED MEGGER EICN# -- ELEMENT ET ...

http://foia.msfc.nasa.gov/docs/praca/A08086.doc

Date added: May 3, 2013 - Views: 9

doc
Section 26 05 13, Medium-Voltage Cables - Office of ...

SECTION 26 05 13. MEDIUM-VOLTAGE CABLES. SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable ...

http://www.cfm.va.gov/TIL/spec/260513.doc

Date added: November 3, 2011 - Views: 61

doc
TESTING PROCEDURES - University of Kentucky

Megger all cables and record the readings before and after the ... Measure temperature and humidity before the Hi Pot Test and include these reading on the Test Report.

http://www.uky.edu/EVPFA/Facilities/CPMD/standards/div16/16950s01.doc

Date added: April 14, 2012 - Views: 51

doc
26 08 30 (16972) - Electrical Starting and Testing by ...

.2 Megger test using 250V Megger between core and ground to ensure no other grounds exist between core and ... Note on report form all data in reference to equipment.

http://www.infrastructure.alberta.ca/Content/docType486/Production/26_08_30B.doc

Date added: May 10, 2013 - Views: 19

doc
ELECTRICAL SAFETY AUDITING - The Best Risk Management ...

ELECTRICAL SAFETY AUDITING CHECKPOINTS. P.G. Sreejith. Cholamandalam MS Risk Services Ltd. Chennai, INDIA. [email protected] Compliance to Statutory Rules

http://www.cholarisk.com/Files/ES%20Audit%20Checkpoints.doc

Date added: October 20, 2011 - Views: 183

doc
TO: All Operations - United States Mine Rescue Association ...

U.S.DOL-MSHA Investigative Report No.: S-031381-20 “MSHA Metal & Nonmetal Electrical Grounding Requirements ... a megger will be used to check for continuity.

http://www.usmra.com/repository/category/electrical/EMS_ELECTRICAL_GROUNDING_PROGRAM.doc

Date added: December 3, 2011 - Views: 34

doc
SURVEY REPORT ON SOLAS GMDSS

SURVEY REPORT ON SOLAS GMDSS. RADIO TECHNICIAN’S SURVEY. ... .For NIS ships, transmitting results to be tested with MEGGER:_____ MEGOHM (>50 MOHM dry, ...

http://www.ubsho.com/download/OMCS/Report/CRC-01.doc

Date added: May 18, 2013 - Views: 15

doc
Buildings Maintenance Guide Cards - Internal Revenue Service

Test alarm report devices and subsystems and analyze visual, audible and printed annunciation. ... Document all maintenance and cleaning procedures by date and time.

http://www.irs.gov/pub/irs-procure/techexhibit4_pm_guide_cards.doc

Date added: September 18, 2011 - Views: 202

doc
SECTION 16856 -ELECTRIC HEATING CABLES - Delta-Therm Corporation

Perform insulation resistance (megger) test on each heating cable before, ... Submit written test report showing values measured on each test for each cable.

http://www.delta-therm.com/specs/Snow%20Melt%20Spec.doc

Date added: September 3, 2013 - Views: 6

doc
MSFC PRACA : 2003-02-12 07:54

CHROMALOX HEATER FAILED MEGGER TEST EICN# -- ELEMENT ET Contractor ... System ASSESSMENT ADDENDUM REPORT MSFC Report# A03584 IFA# -- Contractor RPT# E ...

http://foia.msfc.nasa.gov/docs/praca/A03584.doc

Date added: June 4, 2013 - Views: 16

doc
TURN OVER PACKAGE GUIDE - Colarelli Construction - Colorado ...

Turn Over Package (TOP) rather than establishing minimum documentation requirements. ... A. Megger armature windings and report results .

http://colarelliconstruction.com/documents/turn_over_package_guide.doc

Date added: August 7, 2013 - Views: 58

doc
Flashover Performance of a Rod-rod Gap Containing a Floating ...

A mutual project between Megger and TSV ... 1996 P. Illuzzi, “Abstract about measures on V-type OLTC Model”, TSV Lyon-Megger Sweden internal report, ...

http://www.seeei.org/EL2014/Papers/058+.doc

Date added: December 7, 2014 - Views: 1

doc
Contractor and its employees and - California Courts - Home

... HKA Vertical Transportation Modernization Specifications, Exhibit I, Asbestos Reinspection Report, and ... that was in the AOC’s solicitation document.

http://www.courts.ca.gov/documents/OCCM-2012-01-CC-ATTACHMENT-4.docx

Date added: September 7, 2012 - Views: 82

doc
1 - BHEL PSWR

test the insulation of boards with 500 v dc megger & the value should be as per the relevant is specification ... test report of relays,pts,cts included in the system.

http://www.bhelpswr.co.in/Technical/PSSR-Simhadri%20docs/Electrical/elect-2/copy%20of%20elect/LT%20SWGR%20TEST%20SCH.doc

Date added: May 25, 2013 - Views: 2

doc
Conductors and Connectors

... 480 volt and below, with a 1,000 volt megger. The written test report listing the results of the test to be included in the Operating and Maintenance Manuals.

http://www.mfia-eng.com/Client_Download/Vallaster%20Corl%20Architects/Electrical/26%2005%2019_Electrical%20Power%20Conductors%20and%20Cables.doc

Date added: December 17, 2014 - Views: 1

doc
ETE-01-01: FORM 1 – RAIL BREAK REPORT - ARTC - Intranet ...

Title: ETE-01-01: FORM 1 – RAIL BREAK REPORT Author: katrina bowden Last modified by: jspa1 Created Date: 11/26/2007 6:09:00 AM Company: Protech Australasia

http://extranet.artc.com.au/docs/eng/signal/forms/maintenance/SMP23F-04.doc

Date added: July 16, 2013 - Views: 3

doc
CV FGoil92

Preparing necessary documents needed to generating Inspection Test Report ... Visual Checked for Electrical & Instrument Support Installation, Megger Test, ...

http://xa.yimg.com/kq/groups/4286282/907080146/name/CV%20Paulus%20Mar%2711.doc

Date added: November 23, 2014 - Views: 1

doc
7 - IEEE-SA - Working Group

Diego M. Robalino IEEE/PES/SA status confirmed Megger Wally Binder. WG C57 ... A copy of the Membership Application is attached as an Annex to this Secretary’s Report.

http://grouper.ieee.org/groups/transformers/meetings/S2014-Savannah/Minutes/S14-SecretaryReport.doc

Date added: April 24, 2014 - Views: 6

doc
ETE-01-01: FORM 1 – RAIL BREAK REPORT - ARTC - Intranet ...

Title: ETE-01-01: FORM 1 – RAIL BREAK REPORT Author: katrina bowden Last modified by: jspa1 Created Date: 11/26/2007 6:06:00 AM Company: Protech Australasia

http://extranet.artc.com.au/docs/eng/signal/forms/maintenance/SMP23F-03.doc

Date added: March 11, 2013 - Views: 1

doc
SCOPE OF WORK: - TN

perform a laboratory analysis on oil samples and provide written report on findings and oil ... (megger with scr assembly ... a.in the event of a generator ...

http://tn.gov/generalserv/cpo/sourcing_sub/itb/documents/Generator_Contract_Scope_of_Work_7127.docx

Date added: August 18, 2013 - Views: 27

doc
Polar Sea FY’05 PMA

CONDITION FOUND REPORT. ... 3.0, 3.2: Dry out swivel enclosure, conduct megger testing of all wires to verify condition for further use. 2.3, 2.3.3, 3.4: ...

http://icefloe.net/files/CFR_4015-057_Allied_Systems_Crane_Reports(Resp)%5b1%5d.doc

Date added: December 10, 2013 - Views: 6

doc
Commissioning Sequence Progress Check Sheet

Report Submitted and Approved (cable megger; Grounding) _____ _____ O & M Manual (Final) Submitted _____ _____ Training Scheduled and Completed ...

http://www.umaec.umich.edu/wp-content/uploads/2013/10/Electrical-Power-Sys.doc

Date added: August 26, 2014 - Views: 2

doc
9 - IEEE-SA - Working Group

Recognition and Awards Report ... Diego M. Robalino Megger William J. Solano ABB Susmitha Tarlapally ABB Alexsandr Levin Weidmann Michael Miller WE Energies

http://grouper.ieee.org/groups/transformers/meetings/S2014-Savannah/Minutes/S14-AwardsReport.doc

Date added: September 4, 2014 - Views: 1

doc
Radio Technicians Survey slr/gmdss - American Bureau of Shipping

Associated REPORT NO. DATE RADIO TECHNICIANS SURVEY. ... For NIS ships, transmitting results to be tested with MEGGER: MEGOHM (>50 MOHM dry, >5 humid) 7.

http://www.eagle.org/eagleExternalPortalWEB/ShowProperty/BEA%20Repository/MyEagle/ClassificationForms/RadioTechnicianForms/GMDSS

Date added: November 5, 2011 - Views: 104

doc
INTERNATIONAL MARITIME BUREAU

CLASSIFICATION INITIAL SURVEY REPORT Name of ship Signal letters Nationality and port of registry Gross tonnage Date keel laid IMO Number Name, address and ...

http://www.ubsho.com/download/PSR-SURVEY%20REPORT/MA-REP-IN.doc

Date added: May 26, 2013 - Views: 6

doc
1 - BHEL PSWR

test the insulation of boards with 5000 v dc megger & the value should be as per the relevant is specification ... test report of relays,pts,cts included in the system.

http://www.bhelpswr.co.in/Technical/PSSR-Simhadri%20docs/Electrical/elect-2/copy%20of%20elect/HT%20SWGR%20TEST%20SCH.doc

Date added: October 21, 2012 - Views: 7

doc
Domestic Hot Water Heat Maintenance Tracing

Test heat maintenance cable systems after the pipe insulation has been installed and prior to the ... (megger). The heater circuit ... submit separate report for each ...

http://www2.mdanderson.org/depts/cpm/standards/specs/div22/22%2005%2033.doc

Date added: May 10, 2012 - Views: 23

doc
DOCUMENTS TO BE SUBMITTED TO THE OFFICE OF THE CHIEF ...

I.S.I. Approved Insulation Tester/ Megger ... Copies of the educational/Technical testimonials attested by the officer of the Electrical Inspectorate. Test Report ...

http://www.hp.gov.in/Elins/file.axd?file=2011%2f12%2fDOCUMENTS+TO+BE+SUBMITTED+FOR+A+CLASS.doc

Date added: August 23, 2013 - Views: 10

doc
PART 1 – GENERAL - HPS | Hammond Power Solutions, Control ...

Type Test each model design and submit report. ... Insulation resistance (Megger) test. Positive sequence impedance. No ... If transformer is to be used for non ...

http://www.hammondpowersolutions.com/files/HPS_Spec_1.2kV_Eff_Distribution_Transformer.doc

Date added: November 10, 2013 - Views: 8

doc
METHOD STATEMENT FOR

METHOD STATEMENT FOR . ... (with the quantity mentioned in report) would be made to the KM material section. ... Megger / Clamp A.V.O.

http://xa.yimg.com/kq/groups/26854886/475930343/name/Method+Statement+overhead+power+line.doc

Date added: June 1, 2012 - Views: 73

doc
www.delta-therm.com

Pipe heat tracing components, ... (megger) test on each heater ... Submit written test report showing values measured on each test for each cable.

http://www.delta-therm.com/specs/pipe%20trace%20spec%202013.doc

Date added: July 22, 2013 - Views: 2

doc
SECTION 16060 - Brown University

SECTION 26 05 26 - GROUNDING AND ... and submit a written report of the test results for Engineer of ... Perform a megger test using the “Fall-of-Potential Method ...

http://brown.edu/Facilities/Facilities_Management/docs/CSI/26/05/26_05_26.doc

Date added: November 10, 2013 - Views: 2

doc
SUGGESTED IceStop Specification - INDUSTRIAL HEATER ...

... the heating cable shall be tested using a 2,500 volt megger. ... the connection of all splices and tees and a copy of the meggering report shall be supplied to ...

http://iheater.com/tycothermal/roof_and_gutter_de-icing/specifications/icestop_spec.doc

Date added: December 10, 2013 - Views: 3

doc
Outline of Final Report - RITA | National Transportation Library

FINAL REPORT. January 31, 2005. ... an ITS implantation plan is defined as a document that outlines a series of system operations and ... With a MEGGER meter, ...

http://ntl.bts.gov/lib/25000/25000/25039/ITS_Operational_Support-Final_UTRC.doc

Date added: September 9, 2012 - Views: 63

doc
SECTION 16920 - ELECTRICAL ACCEPTANCE TESTING - ITD home Page

SECTION 16920 - ELECTRICAL ACCEPTANCE TESTING. ... C. Test report shall include: ... 2.2 INSULATION RESISTANCE TEST (MEGGER)

http://itd.aaps.k12.mi.us/bid/Bach/Sec_16920.doc

Date added: August 28, 2014 - Views: 2

doc
SUGGESTED XL-Trace Specification - INDUSTRIAL HEATER ...

... the heating cable shall be tested using a 2,500 volt megger. ... A copy of the meggering report shall be supplied to the engineer.

http://www.iheater.com/tycothermal/pipe_freeze_protection_and_flow_maintenance/buried_piping_systems/specifications/xl-trace_buried_pipe_without_monitrace_spec.doc

Date added: November 17, 2013 - Views: 8

doc
PART 1 GENERAL - GE Industrial

Inspect and report concealed damage to carrier within ... Megger and record readings for phase to phase, phase to ground. Individual lengths should be at least ...

http://apps.geindustrial.com/publibrary/checkout/2004%20CSI%20Master%20Format|26%2025%2000.20|generic

Date added: February 11, 2014 - Views: 26

doc
low voltage wiring - FSD Home

LOW-VOLTAGE WIRES (600 VOLT AC) PART 1 ... Utilize the services of an approved independent testing laboratory to perform megger time ... Test equipment and report ...

http://www.laschools.org/fcs/cc/lausd-bidding/download/specifications_-_divisions_02_-_16/specifications_-_division_16/16120_LowVoltageWires_changes_accepted.doc?version_id=44042574

Date added: August 8, 2013 - Views: 9