Megger Report docs

Searching:
Download
Megger Report - Fast Download

Download Megger Report from our fatest mirror

Test Reports Template - HHS - United States Department of ...

4340 dl's @ 8405 KB/s

doc
Test Reports Template - HHS - United States Department of ...

Test report. Version <1.0> <mm/dd/yyyy> VERSION HISTORY [Provide information on how the development and distribution of the Test Report was controlled and tracked.

http://www.hhs.gov/ocio/eplc/EPLC%20Archive%20Documents/46-Test%20Reports/eplc_test_reports_template.doc

Date added: September 1, 2011 - Views: 924

doc
Megger Testing of Busses, MCCs, and Distribution Panels ...

Subject: Megger Testing of Busses, MCCs, and Distribution Panels. Revision Number and Date: R 0 1/17/2011. Procedure No.: LUM-FFA-MNT-0016. ... Report discrepancies or unsatisfactory results to the Work Group Supervisor for follow-up actions.

http://gwenholladay.weebly.com/uploads/5/0/6/9/5069966/lum-ffa-mnt-0016__megger_testing_of_busses_mccs_and_distribution_panels__draft.docx

Date added: May 2, 2013 - Views: 28

doc
CM FILE DOCUMENTS CHECK LIST (FISHING VESSELS)

MSF 1328 Hull Survey Report MSF 1335 Condition of Stern Gear Evidence of Machinery Maintenance Ultrasonics Report Megger Test Report Air Receiver Safety Valve Test Certificate Optional Documents In CM File Doc No. or Sighted Initialled ...

https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/292264/chapter_1_annex_12_part_b_as_at_23_10_2012.doc

Date added: September 4, 2014 - Views: 1

doc
piyushpanchal2007.mynetworksolutions.com

-Cable megger report (primary prior to pulling)-Cable megger report (secondary after pulling)-Pressure test record(TR)-MC check record (remote loop)(green color)-MC punch list -Loop check punch list. 19) What are the required documents for a local loop folder?

http://piyushpanchal2007.mynetworksolutions.com/images/Inst._Insp._and_Qua._Con..doc

Date added: November 1, 2011 - Views: 30

doc
faaco.faa.gov

Use a portable ground testing megger in accordance with manufacturer's instructions to test each ground or group of grounds. The instrument shall be equipped with a meter reading directly in ohms or fractions thereof to indicate the ground value of the ground electrode under test.

http://faaco.faa.gov/attachments/16302N.doc

Date added: October 3, 2011 - Views: 43

doc
26 05 19 - Loomis

Apply megger tests. ... Provide written report of megger test results. Test report to include all test conditions. Do not megger any cables after connecting to any equipment, unless specifically directed to do so by Architect. END OF SECTION.

http://loomis.ca.gov/filesystem/Blue_Anchor_Park_Specs/260519___Low_Voltage.doc

Date added: November 15, 2012 - Views: 13

doc
Megger Testing of Transformers Effective TBD

LUM-FFA-MNT-0020 Megger Testing of Transformers R0Page 19 of 20. Page 20 of 20. Subject: Megger Testing of Transformers. Revision Number and Date: R 0. ... Report discrepancies or unsatisfactory results to the Work Group Supervisor for follow-up actions.

http://gwenholladay.weebly.com/uploads/5/0/6/9/5069966/lum-ffa-mnt-0020__megger_testing_of_transformers__draft.docx

Date added: July 12, 2013 - Views: 45

doc
SECTION 16117 - FRDF TESTS - Federal Aviation Administration

The Contractor shall document with a single entry on the FAA Form 6030-17, Technical ... These tests shall be completed using a 500V megger. The following are the requirements for acceptable conductors: 11 ... The results shall be submitted to the COTR in a “separate” report for ...

http://faaco.faa.gov/attachments/0700346_specs_9.doc

Date added: October 9, 2012 - Views: 47

doc
www.davispickering.com

Near Miss Report. First Report OH. First Report WV. OSHA 300 Log . OSHA 300A Form. OSHA 301 Investigation Form. Accident Form. ... 532a Feeder Cable Megger Report 1 532b Equipment Megger Report 0. Cable Installation Strain Calculations Standard. CCTV, ...

http://www.davispickering.com/training/Quality/0%20CQ%20Program%20Index%20Rev%200d.doc

Date added: June 1, 2014 - Views: 6

doc
Startup & Commissioning - Powell Service

Report damaged or missing components to the Customer. ... DO NOT MEGGER THE BRUSHLESS EXCITER; REFER TO MANUFACTURER’S INSTRUCTIONS. A 10 minute dielectric absorption test is performed on the motor with all windings tied together.

http://www.powellservice.com/PASD%20Test%20Procedures/Startup%20and%20commissioning/PASD_TestingSpec_27FEB2006.doc

Date added: November 14, 2011 - Views: 41

doc
SURVEY REPORT ON SOLAS GMDSS

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS) SURVEY REPORT ON SOLAS GMDSS. RADIO TECHNICIAN’S SURVEY. This form must kept on board and be available for inspection

http://www.ubsho.com/download/OMCS/Report/CRC-01.doc

Date added: May 18, 2013 - Views: 15

doc
PART 1 GENERAL - GE Industrial

Inspect and report concealed damage to carrier within specified time. Store in a clean, ... [500] [1000] [2500] VDC Megger. Megger and record readings for phase to phase, phase to ground. Individual lengths should be at least [3] megohm(s). CLEANING.

http://apps.geindustrial.com/publibrary/checkout/2004%20CSI%20Master%20Format|26%2025%2000.20|generic

Date added: February 11, 2014 - Views: 19

doc
ELECTRICAL SAFETY AUDITING - The Best Risk Management ...

Compliance to inspector’s reports. Submission of accident intimation reports, forms, etc. in time. ... The report format where the observations and recommendations are written together (non-tabular format) is popular and is the one that is commonly in use nowadays.

http://www.cholarisk.com/Files/ES%20Audit%20Checkpoints.doc

Date added: October 20, 2011 - Views: 170

doc
MSFC Problem Reporting and Corrective Action (PRACA) System

MSFC Record # A08086 In-Flight Anomaly Number -- Contractor Report Number E-009 JSC# -- KSC# -- Problem Title CONNECTOR PINS FAILED MEGGER EICN# -- ELEMENT ET Contractor MMMSS FSCM# -- FCRIT 3 HCRIT -- ... MSFC Problem Reporting and Corrective Action (PRACA) System ASSESSMENT ADDENDUM ...

http://foia.msfc.nasa.gov/docs/praca/A08086.doc

Date added: May 3, 2013 - Views: 9

doc
www.tequipment.net

Megger’s MIT420 Insulation Resistance and Continuity Tester has been the instrument of choice of Lou Iaconelli. ... Transfer this data to the customer report. The Voltage Gradient Test:

http://www.tequipment.net/assets/1/26/Documents/Megger/MIT430_EN/mit430_en_doc_5.doc

Date added: January 4, 2014 - Views: 1

doc
PART 1 – GENERAL - Hammond Power Solutions

Type Test each model design and submit report. Type test to include: Induced voltage test. Power frequency withstand voltage test. Insulation resistance (Megger) test. Positive sequence impedance. No load and full load losses in watts. Sound level in decibels.

http://www.hammondpowersolutions.com/wp-content/uploads/2013/03/HPS_Spec_1.2kV_Eff_Distribution_Transformer.doc

Date added: June 21, 2013 - Views: 17

doc
INTERNATIONAL MARITIME BUREAU

CLASSIFICATION SURVEY REPORT. MANDATORY ANNUAL INTERMEDIATE SURVEY Name of ship Signal letters Nationality and port of registry Gross tonnage Date keel laid IMO Number

http://www.ubsho.com/download/PSR-SURVEY%20REPORT/MA-REP-AN.doc

Date added: May 18, 2013 - Views: 2

doc
7

Diego M. Robalino IEEE/PES/SA status confirmed Megger Wally Binder. WG C57.125 (2.5yrs) Joe Watson. PTSC (2.5yrs) Greg Anderson. ... A copy of the Membership Application is attached as an Annex to this Secretary’s Report.

http://www.transformerscommittee.org/meetings/S2014-Savannah/Minutes/S14-SecretaryReport.doc

Date added: May 24, 2014 - Views: 1

doc
TESTING PROCEDURES - University of Kentucky

Megger all cables and record the readings before and after the Hi Pot test. 5. Measure temperature and humidity before the Hi Pot Test and include these reading on the Test Report. 6.

http://www.uky.edu/EVPFA/Facilities/CPMD/standards/div16/16950s01.doc

Date added: April 14, 2012 - Views: 42

doc
Condition Survey Report Form - Indian Ocean Ship Owners ...

Indian Ocean Shipowners’ Mutual P&I Club. Condition Survey. Instructions & Report Form “VESSEL NAME” (Please affix one photograph of the vessel on this cover page)

http://iopai.com/userfiles/files/Indian%20Ocean%20Club%20-%20Condition%20Survey%20Report%20(Others).doc

Date added: June 28, 2014 - Views: 9

doc
MSFC PRACA : 2003-02-12 07:54 - NASA

MSFC Problem Reporting and Corrective Action (PRACA) System WHOLE RECORD REPORT( + ADDENDUM) MSFC Record # A03584 In-Flight Anomaly Number

http://foia.msfc.nasa.gov/docs/praca/A03584.doc

Date added: June 4, 2013 - Views: 15

doc
TURN OVER PACKAGE GUIDE - Colarelli Construction

A. Megger armature windings and report results . B. Calibrate overcurrent relay and provide documentation . C. Test for vibration acceptability and document results . D. Check voltage and amperage output and document results .

http://colarelliconstruction.com/documents/turn_over_package_guide.doc

Date added: August 7, 2013 - Views: 49

doc
SECTION 16856 -ELECTRIC HEATING CABLES - Delta-Therm Corporation

Minimum acceptable megger reading shall be 5 megohms. Measure voltage and current at each unit after concrete has set-up. Submit written test report showing values measured on each test for each cable. ADJUSTING AND CLEANING Keep automatic control system’s slab sensor(s) clean of dirt and debris.

http://www.delta-therm.com/specs/Snow%20Melt%20Spec.doc

Date added: September 3, 2013 - Views: 5

doc
TO: All Operations - United States Mine Rescue Association

U.S.DOL-MSHA Investigative Report No.: S-031381-20 ... Frame ground testing for stationary and portable equipment should be done with a megger (at least 500 volts) on portable equipment, especially portable generators.

http://www.usmra.com/repository/category/electrical/EMS_ELECTRICAL_GROUNDING_PROGRAM.doc

Date added: December 3, 2011 - Views: 28

doc
26 13 90 (16499) - Medium Voltage Power System Maintenance

Medium Voltage Power. 2008-06-02 System Maintenance Use this Section to specify maintenance requirements for Medium Voltage Power Systems (above 750 Volts), including inspection and report requirements.

http://www.infrastructure.alberta.ca/Content/docType486/Production/26_13_90_PMS.doc

Date added: October 21, 2011 - Views: 33

doc
Radio Technicians Survey slr/gmdss - American Bureau of Shipping

Associated REPORT NO. DATE RADIO TECHNICIANS SURVEY. PORT OF REGISTRY CALL SIGN MMSI NUMBER IMO NUMBER OFFICIAL NUMBER TELEX ID NUMBER ... For NIS ships, transmitting results to be tested with MEGGER: MEGOHM (>50 MOHM dry, >5 humid) 7.

http://www.eagle.org/eagleExternalPortalWEB/ShowProperty/BEA%20Repository/MyEagle/ClassificationForms/RadioTechnicianForms/GMDSS

Date added: November 5, 2011 - Views: 90

doc
9 - IEEE-SA - Working Group

Recognition and Awards Report – Bill Chiu. The Awards were presented at the Tuesday Awards Luncheon. ... Diego M. Robalino Megger William J. Solano ABB Susmitha Tarlapally ABB Alexsandr Levin Weidmann Michael Miller WE Energies

http://grouper.ieee.org/groups/transformers/meetings/S2014-Savannah/Minutes/S14-AwardsReport.doc

Date added: September 4, 2014 - Views: 1

doc
Buildings Maintenance Guide Cards - Internal Revenue Service

Reports and Records: GSA Form 349, Inspection Report of Boiler, shall be prepared for each boiler when it is inspected. ... Test alarm report devices and subsystems and analyze visual, audible and printed annunciation. Clean, recalibrate, ...

http://www.irs.gov/pub/irs-procure/techexhibit4_pm_guide_cards.doc

Date added: September 18, 2011 - Views: 186

doc
SUGGESTED XL-Trace Specification - INDUSTRIAL HEATER ...

... the heating cable shall be tested using a 2,500 volt megger. ... A copy of the meggering report shall be supplied to the engineer. All material shall be installed in accordance with the manufacturer's recommendations. Title:

http://www.iheater.com/tycothermal/pipe_freeze_protection_and_flow_maintenance/buried_piping_systems/specifications/xl-trace_buried_pipe_without_monitrace_spec.doc

Date added: November 17, 2013 - Views: 8

doc
www.cityofdenton.com

www.cityofdenton.com

http://www.cityofdenton.com/home/showdocument?id=20698

Date added: October 9, 2014 - Views: 1

doc
Polar Sea FY’05 PMA

CONDITION FOUND REPORT. Todd Project No. 4015. Project CFR No. Craft CFR No. Activity No. Definite No. / Option No ... Dry out swivel enclosure, conduct megger testing of all wires to verify condition for further use. 2.3, 2.3.3, 3.4: Troubleshoot and repair crane cab heater, crane horn and ...

http://icefloe.net/files/CFR_4015-057_Allied_Systems_Crane_Reports(Resp)%5b1%5d.doc

Date added: December 10, 2013 - Views: 5

doc
Eskom Documentation Centre Main Template

Site Test Report 2/1 to 2/10. 3. Inspection Check List Commissioning 3/1 ... (Maximum 1000volt megger) _____. 3. Operational Checks of Protection Equipment: a. Gas ...

http://www.bits.eskom.co.za/Bits/dtechsec/distribu/tech/SPECIFIC/scaad3R8_AnnexB.doc

Date added: May 8, 2014 - Views: 17

doc
DOCUMENTS TO BE SUBMITTED TO THE OFFICE OF THE CHIEF ...

I.S.I. Approved Insulation Tester/ Megger of 2500 Volts. Ampere Meter 0-100 Ampere Range and Volt meter 0-500 Volts or Tong Tester of similar/above ranges. One line Tester. ... Test Report form duly filled in by the supervisor( Self or Employed).

http://www.hp.gov.in/Elins/file.axd?file=2011%2f12%2fDOCUMENTS+TO+BE+SUBMITTED+FOR+A+CLASS.doc

Date added: August 23, 2013 - Views: 8

doc
Section 26 05 13, Medium-Voltage Cables - Office of ...

Factory Test Reports: Submit certified factory production test reports for approval. b. ... The report shall provide conclusions and recommendations for corrective action. H. Final Acceptance: Final acceptance shall depend upon the satisfactory performance of the cables under test.

http://www.cfm.va.gov/TIL/spec/260513.doc

Date added: November 3, 2011 - Views: 55

doc
ELECTRONICS 102 DC - Heartland Community College

Megger Lab if time allows. Relay Lab using the microcontroller. 4-22-13. Lecture. 4-22-13. Lab #6. RC R/L Time Constants. Chapter 22 # 2. 2-1. ... include report and excel graph. REPAIR LAB. 5-6-13. Lecture. 5-6-13. Lab #8. Complex Numbers. Resonance. Filters. EXCEL LAB PROJECT. Chapter 25 ...

http://www.technology.heartland.edu/faculty/chrism/ac%20dc/Spring%202013%20ELTC%20103%20schedule.docx

Date added: May 4, 2013 - Views: 20

doc
Electrical Safety Auditing - The Best Risk Management ...

The advantages include unbiased reporting, and an expert view of the electrical system from the safety point of view. ... is that a process section / unit in-charge can be asked to comply with the recommendations by giving a copy of the report section to him.

http://www.cholarisk.com/files/electricalsafety.doc

Date added: October 25, 2011 - Views: 194

doc
ELECTRONICS 102 DC - Heartland Community College

Megger Lab if time allows. Relay Lab using the microcontroller. 4-18-11. Lecture. 4-18-11. Lab #6. RC R/L Time Constants. Chapter 22 # 2. 2-1. ... include report and excel graph. REPAIR LAB. 5-2-11. Lecture. 5-2-11. Lab #8. Complex Numbers. Resonance. Filters. EXCEL LAB PROJECT. Chapter 25 ...

http://www.technology.heartland.edu/faculty/chrism/ac%20dc/Spring%202011%20ELTC%20103%20schedule.docx

Date added: August 19, 2013 - Views: 13

doc
CURRICULUM VITAE - Arabian Fal

Report on the integrity of explosion-protected equipment in hazardous areas. Install explosion-protected equipment and wiring systems. ... (Megger, Contact resistance test, mechanical operation of breaker rack in rack out, earth switch, ...

http://www.arabianfal.com/NormalUser/Resumes/Moinuddin.doc

Date added: July 20, 2013 - Views: 13

doc
Quickstart Resume Template

Preparation of material receiving report & report to client for material receiving inspection. ... Megger, continuity & hi-pot test of power, control & instrument cables before pulling and after installation. Inspection of link power, ...

http://xa.yimg.com/kq/groups/13122618/1704592911/name/Curriculum+Vitae+Of+Santhosh+Joy.doc

Date added: August 11, 2013 - Views: 15

doc
Electrical safety auditing - Cholamandalam AXA Risk Services Ltd.

ELECTRICAL SAFETY AUDITING (Presented in the IEEE-IEEMA Electrical Safety Workshop on 22nd January 2002 at Mumbai, India) BY . P.G. Sreejith, Manager (Risk services)

http://web-safety.com/Exchange/Downloads/Electrical_safety_audit.doc

Date added: October 20, 2011 - Views: 126

doc
SCOPE OF WORK: - TN

provide a full report of the readings to the agency representative upon completion . ... e.visually inspect the wire/cable insulation and perform a megger test and record readings of insulation breakdown. f.replace spark plugs and wires ...

http://tn.gov/generalserv/cpo/sourcing_sub/itb/documents/Generator_Contract_Scope_of_Work_7127.docx

Date added: August 18, 2013 - Views: 22

doc
Domestic Hot Water Heat Maintenance Tracing

The heater circuit shall be continuous and megger readings shall be at least 1000 megohm regardless ... shall be recorded, describing date, persons involved and results. If testing is performed in segments, submit separate report for each segment, complete with diagram or clear description of ...

http://www2.mdanderson.org/depts/cpm/standards/specs/div22/22%2005%2033.doc

Date added: May 10, 2012 - Views: 15

doc
METHOD STATEMENT FOR

Reports: After Completion of one Line maintenance report will be submitted to KM by the contractor. Notes: All the steps works shall be inspected by Kahramaa and should be informed before starting any activity with 48 hours at least before.

http://xa.yimg.com/kq/groups/26854886/475930343/name/Method+Statement+overhead+power+line.doc

Date added: June 1, 2012 - Views: 68

doc
SECTION 16060 - Brown University

... and submit a written report of the test results for Engineer of Record review and inclusion in the O & M Manuals. Perform a megger test using the “Fall-of-Potential Method” to determine that the proper ground resistance has been achieved.

http://brown.edu/Facilities/Facilities_Management/docs/CSI/26/05/26_05_26.doc

Date added: November 10, 2013 - Views: 2

doc
SUGGESTED IceStop Specification

... the heating cable shall be tested using a 2,500 volt megger. ... Both bus wires and braid shall be tested to verify the connection of all splices and tees and a copy of the meggering report shall be supplied to the engineer. All material shall be installed in strict accordance with the ...

http://iheater.com/tycothermal/roof_and_gutter_de-icing/specifications/icestop_spec.doc

Date added: December 10, 2013 - Views: 2

doc
16972 - Electrical Starting and Testing by Contractor's ...

Use one sample for dielectric strength tests in accordance with ASTM D877 67. ... C/T's and P/T's for signs of damage. Note data on test report form..2 Megger test all insulators to ground..3 Megger test bussing phase to ground and phase to phase.

http://www.infrastructure.alberta.ca/Content/doctype486/Production/16972b.doc

Date added: November 6, 2011 - Views: 71

doc
Electric Toaster - Welcome to msme

... (In Months) Preparation of project report 1 Registration and other formalities 1 Sanction of loan by financial Institutions 3 Plant and ... 1 no. 12,000 H. V. tester 1 no. 8,500 Ammeter and Voltmeter 2 nos. 2,000 Megger 1 no. 3,500 Solar battery Connectors 2 no. 2,500 ...

http://www.msmedinewdelhi.gov.in/projectProfiles/Solar%20Cooler%20Projec-Report.doc

Date added: June 13, 2012 - Views: 17

doc
SPECGUID.MW5

Each assembly shall be tested for insulation integrity (Megger) Phase to Ground and Phase to Phase before shipment using 500V Megger output. ... MSDS and Test Report. Each assembly shall be bolted to the wood pallets and strapped to the pallet.

http://www.eaton.com/ecm/idcplg?IdcService=GET_FILE&dID=223222

Date added: August 12, 2013 - Views: 1

doc
NUR131 - Health Assessment

... organization, composition, documentation, and report presentation are used throughout this discipline. INDUSTRY/PROFESSIONAL COMPETENCIES: ...

http://intranet2.dpe.edu/POIs/Documents%20for%20Review/Plans%20of%20Instruction/D%20-%20E%20Programs/ELT/ELT%20122%20Advanced%20AC-DC%20Machines.doc

Date added: September 4, 2014 - Views: 3

doc
low voltage wiring - FSD Home

Utilize the services of an approved independent testing laboratory to perform megger time-resistance insulation testing of feeder conductors. ... Test equipment and report requirements stipulated under section 3.01.N.1 apply to branch circuit testing.

http://www.laschools.org/fcs/cc/lausd-bidding/download/specifications_-_divisions_02_-_16/specifications_-_division_16/16120_LowVoltageWires_changes_accepted.doc?version_id=44042574

Date added: August 8, 2013 - Views: 5